Real World Crypto Assets
Join the revolution of owning, and interacting with NFT assets inspired by Otago's gold rush, backed by real gold stored in certified vaults in London via PAXG
Discover the Next Gold Rush!
Otago Gold revolutionizes gold ownership through NFTs and smart contracts, merging rich heritage with innovative blockchain technology for a unique trading experience inspired by New Zealand's historic gold rush.


Pioneering Crypto to Real World Assets!
Innovative NFT Platform
Experience the future of digital gold ownership through our unique NFT platform inspired by Otago's heritage.
Our Tier Two tokens offer great returns on your Ethereum.
Estimated ROI of 45%*
Access to our Shotover River and Arrow River prospecting permits.
Will receive regular PAX Gold airdrops directly to your wallet
10 ETH secures your Tier Two token
Only 200 will be minted
Less than 100 left
*The ROIs are based on five wash plants being in operation across the three projects
Our Tier One tokens offer the highest returns and the opportunity to engage with the project via field visits and interaction with the project creators.
Estimated ROI of 76%*
Access to our Shotover River and Arrow River prospecting permits.
Will receive the highest PAX Gold airdrops directly to your wallet.
20 Ethereum secures your Tier one token (subject to availability).
Only 10 will be minted.
Sold out! - Enquire about resale opportunities.
*The ROIs are based on five wash plants being in operation across the three projects
Tier One
Tier Two
Otago Gold Projects
Lower Nevis Project
Lower Nevis with its estimated 4000 Oz of gold reserves has now been proven higher with bulk sampling, and will move into full production in mid-2026. It is projected to produce 5 Oz of gold per day.
The cost of mining is low due to the area being an old river bed with an average depth of 4 metres. The gravels are easily mined with an excavator and fed through a wash plant.
Our bulk sampling carried out in May 2025 indicated that the gold grades were much higher than our first expectation, and as a result this project will be fast tracked into production.
Pomahaka Project
Featuring an active riverbed and an old paleo channel with an estimated reserve of 8,000+ Oz, this project is scheduled to be bulk sampled and tested in late 2025.
Subject to the bulk sampling work, mining is expected to commence in late-2026. Based on work done to date we reasonably expect this area to deliver 5 Oz per day. Full scale mining will ramp up through 2026 to 2027.
This is a very large resource deposit with an estimated life of 10-12 years.
Upper Nevis Project
The Upper Nevis is several kilometres up stream of the Lower Nevis permit, with expected gold deposits to be higher than originally planned based on the results from the recent work done on the Lower Nevis.
The Upper Nevis is a larger project with a projected deposit of 10,000 to 12,000 Oz of gold. This may be revised upwards once the bulk sampling work is done. Bulk sampling is planned for mid-2026 to determine the highest yielding areas.
Once this area goes in full production in late 2026 we expect to see the permit produce 10 Oz per day. Cost of mining is low, as it is an old river bed, similar to the Lower Nevis, with shallow deposits easily worked with an excavator and wash plants..
Get in touch
We welcome your questions about our project and look forward to having you join us
Heritage & Technology
Experience tangible real world asset back NFT's today
Contact Information
© 2025. All rights reserved.